Calculation logic
The monthly or daily target is first divided by the working day. Then, waste rate, operational efficiency and mold cycle time are taken into account. As a result, the daily production capacity of a mold is compared with the target demand.
- You can enter the target monthly or daily.
- You can choose simple or detailed conversion logic.
- The reserve ratio is added for the continuity margin in production.
Practical notes
- As the cycle time decreases, the number of active dies required decreases.
- Productivity rate and waste rate directly affect the result.
- In special production, final control should be made with trial data.
Frequently Asked Questions
What does the number of products in a mold mean?
It refers to the number of pieces coming out simultaneously in a single cycle.
What is the difference between simple and detailed cycle?
Simple mode works by entering a single duration. Detailed mode collects filling, curing, emptying and cleaning times separately.
Why is a spare die added?
Maintenance is to keep production safe for unexpected downtime and quality control.
Can I take the result directly to production?
This tool is for planning. It would be better to do a short test on your own line before mass production.


