Developing a branded product
Agree branding position, legibility and its effect on use during design. Test small embossed features at actual size instead of relying on screen previews. Verify permission to use the artwork and its approved version, and keep product and packaging information consistent.
Product-specific checks
Design the inner core, drainage opening and base thickness together. A thin rim can break during demoulding; inspect rim integrity, upright stability and drainage on the first casting. Follow the concrete supplier's mixing and curing instructions.
Application and sample checks
Define finished dimensions, casting material and critical surfaces first. Record production variables and reassess approval whenever the material or master changes; an earlier sample does not automatically validate a revised process.
Information for your project brief
- A dimensioned drawing or reference images from several views
- Casting material and target quantity of accepted parts
- Critical dimensions, finish requirements and acceptance criteria
- Scope of samples, revisions and delivery
Related guides
- Concrete planter mould: How is it made?
- Concrete planter mould: How to choose
- Concrete planter mould: What affects the price?
- Concrete planter mould: Before ordering
Discuss your project
Share dimensions, material and target quantity to define the quotation scope. We can review the requirements for the master, mould and trial casting together.
